LEMCD Contact: lemcd@lem.com.sg · Free consultation is preliminary only. Paid professional scope requires written quotation and payment arrangement.
Underground Utilities Risk Management & Compliance Consultancy

LEMCD – Licensed Cable Detection & Pre-Earthwork Utility Risk Support

LEMCD supports contractors, consultants, developers and project owners before excavation, piling, trenching, trial holes, NCE-related works, road works, linkway construction, airport works and utility-sensitive construction activities.

Full-line utility detection support

  • LCDW / TCDW capability
  • EML locating, CAT4 + Genny, Sonel LKZ-2500 and supporting locators
  • NCE / NCD / route-map and service-layout coordination
  • Site marking, detection records and reporting support
  • LTA / HDB / Town Council / industrial / CAAS / Changi / Seletar support

From Cable Detection to Underground Utility Risk Management

LEMCD is positioned beyond basic cable locating. Our focus is regulated, documented and compliance-aware underground utilities risk management for projects where utility damage can cause safety, operational, contractual and financial consequences.

LCDW Route

Power and utility-sensitive work support

LCDW-led underground cable detection and pre-earthwork risk support, with broader utility-risk coordination for services such as power, gas, PUB water, PUB sewer and other underground installations where drawings, trial holes and service-owner controls are required.

TCDW Route

Telecom cable detection and multi-telco coordination

TCDW-related support for telecommunications cable detection, route-plan review and practical coordination in a wider telco-control environment, including major parties commonly encountered in practice.

Enterprise Route

High-value utility risk consultancy

Formal quotation and term-service support for LTA, HDB, Town Council, industrial, airport, CAAS / Changi / Seletar and other critical-facility works.

Professional value protection: Free consultation is preliminary only. No reliance shall be placed on free discussion, verbal comments or informal messages as site clearance, permit advice, cable-clear confirmation, utility-risk certification or assumption of responsibility by Le Management (2011) Pte Ltd.

Services

LEMCD provides full-line underground utility detection and compliance-support services. Final scope is subject to written quotation, site access, drawings, utility-owner information, permit/NCE status, manpower availability and technical feasibility.

Licensed Cable Detection

LCDW / TCDW deployment, EML locating, active/passive detection, route marking, photo records and detection report support.

NCE / NCD / Route Map Support

Route-map request, plant map coordination, NCE/NCD preparation support, service-owner information control and validity tracking.

Pre-Earthwork Utility Risk Review

Desktop drawing review, site walkdown, risk briefing, trial-hole recommendation and contractor readiness checking.

Trial-Hole and Marking Support

Trial-hole planning, site marking, corridor awareness, discrepancy recording and briefing support before excavation or piling.

Airport and Critical-Facility Support

CAAS / Changi / Seletar / industrial / infrastructure support where operational sensitivity, permits and stakeholder controls are higher.

Equipment Rental and Training Support

CAT4 / Genny / clamp set rental, EML awareness, utility-damage prevention briefing and controlled equipment deployment.

Project Sectors Supported

LTA / Road Works

Excavation, piling, trenching, linkways, utility diversion and workfront readiness.

HDB / Town Council

Upgrading, lift-related works, footpaths, drainage, lighting and estate works.

Industrial / Infrastructure

Factories, substations, plants, utilities, logistics facilities and infrastructure corridors.

CAAS / Changi / Seletar

Airport and critical-facility projects requiring stronger permit-readiness and stakeholder control.

Service Tiers and Market Rate Guidance

The following rates are control guidance for initial client understanding. Final quotation depends on site complexity, urgency, service owners, deliverables, working hours, permit/NCE conditions and liability exposure. Rates exclude GST and third-party charges unless expressly stated.

Tier / ServiceTypical UseRate GuidancePayment Control
Free ConsultationPreliminary enquiry, scope direction, quotation pathway only.FreeNo professional reliance. No site attendance. No report.
Pro Planned ServicePlanned LCDW/TCDW site service more than 14 days later.From SGD 450 before GSTAdvance payment to reserve date.
Plus Immediate ServiceService required within 1–14 days, subject to manpower and access.From SGD 550 before GSTImmediate prepayment before deployment.
Half-Day DeploymentMultiple work areas, detection with report/marking support.SGD 650–900 before GSTPrepayment unless enterprise approved.
Full-Day DeploymentLarge workfront, repeated checks, standby or complex site.SGD 1,000–1,500 before GSTPrepayment unless enterprise approved.
NCE / NCD / Route Map SupportPermit/route-map/drawing coordination and service-owner support.From SGD 330 before GSTProvider fees and third-party charges separate.
Enterprise / Airport / Critical FacilityLTA, CAAS, Changi, Seletar, industrial, term service, high-risk works.Formal quotationPO / approved credit terms only if accepted in writing.
Separate charges: Authority fees, utility-provider fees, route-map purchase, portal charges, traffic control, trial holes, excavation, reinstatement, GPR, PE/QP/LEW endorsement, night/Sunday/PH work, urgent mobilisation and third-party costs are excluded unless expressly included.

Compliance and Technical Limitations

Detection is not absolute site clearance

Cable detection results are subject to site conditions, available records, signal interference, service type, depth, access constraints, non-metallic utilities, direct-current systems, fibre optics, congested corridors and other technical limitations.

Records first Obtain available drawings, route plans, NCE/NCD records and service-owner information.
Detect and mark Carry out licensed detection, mark detected routes and record method/limitations.
Confirm by trial holes Use manual trial holes where required to positively verify actual utility position and depth.
Control excavation Use safe method, supervision, protection measures, briefing records and permit compliance.

Service Portal / Quotation Request

Until the full online portal is connected, clients may request service by email. Internal review is required before acceptance of any site deployment or professional responsibility.

Request LEMCD Service

Send project name, site address, work scope, preferred date, drawings/route plan if available, NCE/permit status and required service type to lemcd@lem.com.sg.

Email Service Request

Contact

LEMCD – Le Management Cable Detection Unit

Le Management (2011) Pte Ltd
Underground Utilities Risk Management & Compliance Consultancy
Email: lemcd@lem.com.sg

Internal control reminder

Free enquiry shall not create professional responsibility. Paid work starts only after scope review, written quotation, payment/PO arrangement, manpower confirmation, site access confirmation and technical feasibility check.